Shock Test - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

C
1 M
HAPTER
AINTENANCE

8.0 Shock Test

WARNING!
Take the necessary precautions to guard against shock or injury before you start
conducting the defibrillator tests.
Keep hands and all other objects clear of the multi-function cable connections and
defibrillator analyzer when discharging the defibrillator.
Before you discharge the defibrillator, warn everyone near the equipment to STAND
CLEAR.
Fluke Impulse 7000 DP Analyzer (or equivalent), stop watch
Equipment
Do This...
8.1
Turn on the Analyzer.
8.2
On the Analyzer, select the DEFIB function.
8.3
On the Analyzer, select ENERGY.
8.4
Connect the Propaq MD MFC connector to
the pads connection.
8.5
On the Propaq MD unit, apply power to the
unit using a battery or an AC adapter.
8.6
Connect the MFC cable to the Propaq MD
unit.
8.7
Turn on the Propaq MD unit, and press the
Leads quick access key
PADS
8.8
On the Propaq MD unit, set energy level to
5J by pressing the Energy Select DOWN
arrow.
8.9
On the Propaq MD unit, press the
CHARGE button.
8.10 On the Propaq MD unit, press the Shock
button.
8.11 On the Analyzer, observe and record the
energy measurement.
8.12 On the Propaq MD unit, set the energy level
to 50J by pressing the Energy Select UP
arrow.
22
T
ESTS
I, II,
(
)
to select
III...
.
Observe This...
The unit charges to 5J, the red
Shock button illuminates and a
ready tone sounds.
Energy is delivered at 5J. Verify
that the delivered energy is within
15% based on the values in the
table "Delivered Energy at 200J
Defibrillator Setting into a Range
of Loads" on page 25.
9650-0801-01 Rev. B
Pass/Fail
o o
o o

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents