Etco2 Calibration (Required For Annual Calibration) - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

14.0 EtCO
5% CO
Equipment
2
Products, PN 4653ORF-BD)
Do This...
14.1
Turn on the Propaq MD unit.
14.2
On the Propaq MD unit, select
Supervisor>Service>Diagnostic>CO
Calibration to enter the CO
control panel.
14.3
Connect the Propaq MD unit to the 5%
CO
sample line included with the calibration
kit.
14.4
From the CO
Calibration.
14.5
Activate the calibration gas flow by
pressing the top valve on the calibration gas
canister.
14.6 Continue to apply the calibration gas until the
status in the CO
displays: CALIBRATION GAS CAN BE
REMOVED.
The calibration date will be updated upon
exiting the CO
9650-0801-01 Rev. B
Calibration (required for annual calibration)
2
calibration gas cylinder with CO
calibration gas cylinder using the
2
Calibration Menu, select
2
Calibration control panel
2
When the calibration is complete, the
status in the CO
Calibration control panel
2
displays: CALIBRATION DONE-OK
Test control panel.
2
Propag MD Service Manual
sample line (kit available from Scott Medical
2
Observe This...
>
2
Calibration
2
Propaq MD Overview
Pass/Fail
o o
o o
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents