Installation Checklist; Contents Of This Chapter - ABB ACS580-04 Hardware Manual

Drive modules (200 to 500 kw)
Hide thumbs Also See for ACS580-04:
Table of Contents

Advertisement

Installation checklist

Contents of this chapter

This chapter contains a list for checking the mechanical and electrical installation of the
drive module.
Installation checklist
Go through the checklist below together with another person.
WARNING! Obey the safety instructions in chapter
you ignore them, injury or death, or damage to the equipment can occur.
Check that ...
Cabinet construction
The drive module is fastened properly to the cabinet. (See chapters
cabinet installation, Installation example of drive module with IP20 shrouds (option
Mechanical joints are tightened and not broken.
Parts are clean and painted surfaces not scratched.
The cabinet frame and parts which are in metal to metal contact with the frame (for example seams,
component fixing points on assembly plates, back of control unit mounting plate) are not finished
with non-conducting paint or material.
Degree of protection (IPxx)
Installation checklist 95
8
Safety
instructions. If
Guidelines for planning the
+B051).

Advertisement

Table of Contents
loading

Table of Contents