Main Switch I/O; Operation Of Cooling Unit, Fastcool 10; Mxf Hanging Kit - Kemppi FastMig MXF65 Operating Manual

Hide thumbs Also See for FastMig MXF65:
Table of Contents

Advertisement

2.13.1
installing gas bottle
Always fasten the gas bottle properly in the vertical position, in a special holder against the
wall or on a cylinder carriage. Remember to close gas bottle valve after welding.
parts of gas flow regulator
1
1.
Gas bottle valve
2.
Flow regulation screw
3.
Connecting nut
4.
Hose tail
5.
Hose tail nut
6.
Gas bottle pressure gauge
7.
Shielding gas flow meter
2.14

Main sWitCh i/O

When you turn the main switch of the FastMig™ power source into I-position, the pilot lamp
closest to this switch will illuminate, indicating the power source is ready for welding. The
equipment will return to the operation state as before the main switch was turned to the zero
position.
Always start and switch off the machine with the main switch, never use the mains plug as a
switch.
2.15

OperatiOn OF COOling unit, FastCOOl 10

Operation of the cooling unit is automatic, starting when welding commences. When welding
stops the pump will continue operation for approx. 5 min, so reducing the gun and the
cooling liquid to ambient temperature. Read the operation instructions for the Fastcool 10
unit.
2.16

MXF hanging kit

The MXF 65/67 wire feed units can be hanged from a special hanging kit available as an
accessory. This allows the wire feed unit to be suspended above the work area.
6
3
7
2
5
4
EN
13