Io Test; Burn-In Test - Vision Fitness T9800S Engineering Manual

Hide thumbs Also See for T9800S:
Table of Contents

Advertisement

DGF1J Upper Board: Engineering Guide

3.2.5 IO TEST

Wrap back fixture must be present for this test.
Key
Function
ENTER
Starts test
ELEVATION UP
N/A
ELEVATION DOWN N/A
SPEED UP
N/A
SPEED DOWN
N/A
STOP
Stops Test, returns to test menu
START
N/A
Display
Function
Dot Matrix
blank
Alphanumeric
Displays "WRAP BACK"
Elevation
Received characters
Speed
blank

3.2.6 BURN-IN TEST

The burn in mode can be used to run tests that require the treadmill to continually run. The program is based on the 5K
Run. Segment changes occur every 0.1 mi. or 0.1 km, depending on the treadmill configuration. When the system
reaches the last segment, it loops to the first segment. Speed at program start is at 1/2 maximum speed. The user
can adjust speed and incline. The program returns to the preset incline upon segment completion. Keyboard functions
are the same as in normal operating mode.
Date of last revision: 11.06
16
TREADMILL.UPPERBDENG.DGF1J.CVTM0033.CVTM0031.REV2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T9800hrt

Table of Contents