GE 745 Instruction Manual page 221

Transformer protection system
Hide thumbs Also See for 745:
Table of Contents

Advertisement

CHAPTER 6: ACTUAL VALUES
6.3.6
Demand
6.3.6.1 Main Menu
 DEMAND
6.3.6.2 Demand Data Clear
 DEMAND DATA
CLEAR
745 TRANSFORMER PROTECTION SYSTEM – INSTRUCTION MANUAL
PATH: ACTUAL VALUES

[
]
MESSAGE
MESSAGE
MESSAGE
Current demand is measured on each phase of each monitored winding. These
parameters can be monitored to reduce supplier demand penalties or for statistical
metering purposes. The calculated demand is based on the
METERING
CURRENT DEMAND METER TYPE
displays the demand over the most recent demand time interval, the maximum demand
since the last date that the demand data was reset, and the time and date stamp of this
maximum value.
PATH: ACTUAL VALUES

[
]
MESSAGE
MESSAGE
To clear all maximum demand data, set
that the demand data were cleared is also displayed. If the date has never been
programmed, the default values shown above appear.
A2 METERING
DEMAND

DEMAND DATA
[
]
CLEAR
W1 CURRENT
[
]
DEMAND
W2 CURRENT
[
]
DEMAND
W3 CURRENT
[
]
DEMAND
setpoint value. For each quantity, the 745
A2 METERING
DEMAND

CLEAR MAX DEMAND
DATA: No
DATE OF LAST CLEAR:
Jan 01 1996
TIME OF LAST CLEAR:
00:00:00.000
CLEAR MAX DEMAND DATA
A2 METERING
See page 6–13
See page 6–14
See page 6–14
See page 6–14
S2 SYSTEM SETUP
DEMAND

DEMAND DATA CLEAR
to "Yes". The last time
6–13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents