The appliance must always be started up with the firebox empty, without pellets and without unburned fuel from previous
use.
Do not attempt to ignite the fuel with inflammable liquids or solids; the stove must ignite automatically via the electrical
components installed onboard.
Do not load pellets manually into the firebox before or whilst the appliance is running.
Keep the ventilation grids in the area the appliance is installed in clean conditions.
Never load any fuel other than pellets into the stove storage hopper. Corn, nuts or other combustible materials must not be
used as fuel for the appliance.
Check and periodically clean the fume exhaust pipe, from the appliance to the flue (Union).
It is strictly prohibited to start up the product with the combustion chamber door open or allow it to run with the glass broken.
The user should contact an authorised JOLLY-MEC Technical Assistance Centre if any operating problems persist.
• Never try to start the device using ethyl alcohol or other flammable liquids.
02.3

SAFETY REGULATIONS FOR EXTRAORDINARY MAINTENANCE AND INSTALLATION

The user and/or owner of the product is required, in accordance with the laws in force, to assign the installation and
maintenance to qualified and specialised operators, and acknowledge the risks and hazards should they fail to observe
this requirement.
The installation of the heat generator and the relative combustion product exhaustion system, the electrical connections,
the commissioning and extraordinary maintenance MUST always be performed by Qualified and/or Licensed Professional
Technicians or those Authorised by the Manufacturer.
The product must be installed in accordance with the laws and standards in force in the State, Region or Area in which
the machine is installed.
Installation in bedrooms, rooms with a volume below 15 m
The system installer MUST issue a Declaration of compliance for the work performed after commissioning the system,
in accordance with the laws in force related to system safety standards.
The installation technician must inform the user on safe equipment use.
The installation operator is responsible for the installation and is therefore required to perform the work to top workmanship
standards.
• The appliance must be connected to a combustion product exhaustion flue built in accordance with applicable
standards and certified with a declaration of compliance.
The installation technician is in charge of installation and must check emissions following first installation.
Should any installation defects arise during commissioning, the Authorised Jolly-Mec Technician can refuse to endorse
use of the product for safety reasons and submit a written Servicing Report to the User informing him that he and the
Installation operator shall be jointly liable for any damage to persons, animals or things if used.
Before installing the machine, the customer and installation operator must ensure that the flooring on which it will be
positioned is suitably levelled and can support the weight (see CHAP.06 - TECHNICAL DATA). IIf there is any doubt
on the solidity of the flooring, it is essential to have a Structural Engineer verify relative installation feasibility.
Only specialised and qualified personnel may work or carry out checks inside the machine, complying with safety
regulations.
Prior to installation, the user and installer are obliged to check that the mains electrical supply to which the machine will be
connected, corresponds to the voltage on the identification plate (see CHAP.05.2 - PRODUCT IDENTIFICATION),
check that the system is sized so as to bear the maximum load required of the product, and also that it is equipped with
or with explosive atmospheres is strictly prohibited.