To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. In addition to the switch, verify that the shipping container includes the
following items shown in Table 10.
Two equipment rack or
wall brackets
Eight bracket screws
Four wall screws
Four rubber feet
(for desktop installation)
One regional AC power
cord
Table 10. Packing List