Boat Out Of The Water - Mercury MerCruiser Axius 350 MAG User Manual

With emissions control
Table of Contents

Advertisement

14. Before launching the boat, pull up on the manual release valve. Verify that the green indicators are no longer extended.
15. Open the seacock, if equipped, or unplug and reconnect the water inlet hose prior to operating the engine.

Boat out of the Water

NOTE: This procedure is written for the air pump that is attached to the engine. However, any air source can be used.
1.
Place the boat on a lever surface to ensure complete draining of system.
2.
Remove the air pump from the engine.
3.
Ensure that the lever on top of the pump is flush with the handle (horizontal).
4.
Install the air pump on the actuator fitting.
5.
Pull lever on air pump (vertical) to lock pump on the fitting.
c
b
90-864197084 NOVEMBER 2008
a -
Green indicators
a
6135
e
a
a -
b -
c -
d -
e -
d
8293
Section 6 - Storage
Actuator fitting
Green indicators
Manual release valve
Air pump
Lever (locking)
Page 123

Advertisement

Table of Contents
loading

Table of Contents