Staging The Ap 7181 Prior To Installation - Motorola AP 7181 Installation Manual

Hide thumbs Also See for AP 7181:
Table of Contents

Advertisement

Installation Guide

2.12 Staging the AP 7181 Prior to Installation

WARNING!
1. Place the Access Point on a solid surface with the yoke facing up.
CAUTION
2. Using the 6mm allen wrench, loosen the allen head bolts to remove the yoke.
3. To gain access to the Ethernet and or console ports you will need to remove the protective caps. A 22 mm
socket is required to remove the Ethernet port caps covering Gigabit Ethernet ports GE1 and GE2. A 19 mm
socket is required to remove the console port cap (if required).
An AP 7181 Access Point weighs 39 pounds. Use all appropriate cautions when lifting
and consider a two man lift when necessary.
Never lift an AP 7181 using the radome antenna panels or other plastic parts.
Always lift the unit by the yoke or metal antenna rings.
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents