4.3 Follow-up Procedure

1.
2.
3.
Issue 02 (2013-12-10)
Figure 4-2 Acceptable humidity in the equipment room
Install the electrical control box cover.
Install the air filters. For details, see
Install the cabinet doors and lock the doors. For details, see
Doors.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3.6 Removing the
Filters.
4 Power-On Commissioning