fig. 05 Layout in the boiler room
00.61H.79.00004
Clearance of at least 800 mm is required at the front
(service side) of each boiler module. However, we rec-
ommend a clearance of 1 m. A clearance of at least 400
mm above the boiler and at least 300 mm on both ends
(800 mm if the instrument panel is rotated to face the
short end).
fig. 06 shows the boiler's support area including the
position of the support pads (shaded boxes) supplied.
fig. 06 Support area Remeha Gas 610 ECO
00.61H.79.00005
Number of sec-
tions
2 x 6
2 x 7
2 x 8
2 x 9
table 03 Base dimensions
15
C in mm
D in mm
1590
1118
1980
1508
1980
1508
1980
1508