Cabinet AC Power Component Installation
After the cabinets have been floor mounted, the AC power components should be installed.
3-7
and
3-8
show the primary AC power components required for floor mounted systems.
Table 3-7
Floor Mount Cabinet Component Requirements for 120VAC Primary Power
Local
Electrical
1 Cabinet
Code
Three or more
cabinets
1 – BFIF
require a
conduit box
1.
A BCCB120 conduit connection box must be installed and wired by a certified electrician per the local
electrical code (see
Figure
Table 3-8
Floor Mount Cabinet Component Requirements for 208VAC or 240VAC Primary Power
Local
Electrical
1 Cabinet
Code
Two or more
1 – BACL240
cabinets
require a
1 – BFIF
conduit box
1.
A BCCB240 conduit connection box must be installed and wired by a certified electrician per the local electrical code (see
Figure
3-25).
Strata CTX I&M
10/02
2 Cabinets
3 Cabinets
1
1 -BCCB120
1 – BFIF
1 – BFIF
3-24).
2 Cabinets
3 Cabinets
1
1 – BCCB240
1
1 – BCCB240
1 – BPSB240
2 – BACL240
3 – BACL240
1 – BFIF
1 – BFIF
4 Cabinets
5 Cabinets
1
1
1 – BCCB120
1 – BCCB120
1 – RPSB2
2 – RPSB2
1 – BFIF
1 – BFIF
4 Cabinets
5 Cabinets
1
1
1 – BCCB240
1 – BCCB240
1 – BPSB240
2 – BPSB240
4 – BACL240
5 – BACL240
1 – BFIF
1 – BFIF
Strata CTX670 Installation
Install Reserve Power
Tables
6 Cabinets
7 Cabinets
N/A
N/A
6 Cabinets
7 Cabinets
1
1
1 – BCCB240
1 – BCCB240
2 – BPSB240
3 – BPSB240
6 – BACL240
7 – BACL240
1 – BFIF
1 – BFIF
3-39