Engine Mount Installation; Installing The Stopper Assembly - Seagull Models Savage Cruiser Assembly Manual

Table of Contents

Advertisement

SAVAGE CRUISER

ENGINE MOUNT INSTALLATION.

1) Locate the items necessary to install the
engine mount included with your model.
4x30mm
2) Use four 4x30mm head bolts and four-
4mm washers to attach the engine mount
rails to the firewall. Tighten the screws. Make
sure to use threadlock on the screws to help
prevent them from vibrating loose.
Thread locker glue.
INSTALLING THE STOPPER
ASSEMBLY.
1) Using a modeling knife, carefully cut off
the rear portion of one of the 3 nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
8
8
Instruction Manual.
2) Using a modeling knife, cut one length of
silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other
end to the nylon pick up tube.
Vent tube.
Fuel fill tube.
3x15mm
Fuel pick up tube.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents