Ignition Installation - AeroWorks Carbon Cub SS ARF-QB Assembly Manual

Table of Contents

Advertisement

1. Gather the ignition module, battery, switch,
regulator and installation parts as shown below.
Required Parts
2 - 8x80x300mm Foam Pad
2 - 8x450mm Nylon Ties
Required Parts -Not Included
1 - Ignition Module
1 - Battery (2600mah Li-Ion Shown )
1 - Ignition Regulator (Smart-Fly Shown )
1 - Ignition Switch (MPI Shown )
Required Tools and Adhesives
1 - Pencil/felt tip pen
1 - Electric Drill
1 - 1/16" Drill Bit
1 - Wire Cutter
2. Position the ignition module on the side of the
engine mounting box and mark the location of
the nylon tie holes as shown.

IGNITION INSTALLATION

62
3. Use a 1/4" bit to drill the ignition module
mounting holes.
4. Thread nylon tie through mounting holes.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents