Part 7. Power Up Procedures; Pre-Check; Safety Precautions - Samsung OfficeServ 7030 Installation Manual

Hide thumbs Also See for OfficeServ 7030:
Table of Contents

Advertisement

OfficeServ 7030
TECHNICAL MANUAL

PART 7. Power Up Procedures

This section describes items to check before starting the OfficeServ 7030 system and the
procedure for starting the system.

7.1 Pre-Check

This section describes items to check before starting the OfficeServ 7030 system.

7.1.1 Safety Precautions

Temperature: Check the temperature of the room where the system is installed is
between 32°F and 113°F. If the room temperature is higher or lower than the normal
operation temperature, install a heating/cooling device to maintain normal temperature.
Humidity: Check if the room humidity where the system is installed is between 10% and
90%. Take special caution since the humidity affects the electric components and the
connectors of the system.
Direct Sunlight and Dust: The room where the OfficeServ 7030 system is installed should
be protected from direct sunlight and should have ventilation systems to prevent the
system from malfunctioning due to dusts.
7.1
Home Page
INSTALLATION
PART 7 MAY 2010

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents