Valor 1800JN Installation & Owner's Manual page 49

Dv zc gas fireplace l3 series
Table of Contents

Advertisement

8. Mount switch plate to junction box with 2 long
screws provided. Note: switch position left or right
to suit homeowner wishes.
9. Locate and secure magnet plate using 2 'long'
screws provided
10. Place and secure cover plate to box using 4 screws
provided
11. Feed cable tie through the 2 side slots of battery
cover assembly.
Installation
12. Position battery holder to rear face and secure
together with cable tie. note clearance is required
for battery snap connection.
Cable tie
13. Make the snap connection, load 4 AA alkaline
batteries into holder (included with fi replace) then
feed back into junction box assembly.
Note: Do not put batteries in the receiver, only
in the battery holder by the wall switch.
14. Test the operation of the wall switch—see page 16.
QUALIFIED
INSTALLER
Side slot
Snap connector
Rear view
Front view
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1800jp

Table of Contents