Mitsubishi Heavy Industries FDC112KXEN6 Technical Manual page 77

Table of Contents

Advertisement

Connector for branching
controller of heat recovery
3-pipe systems
Power source line
between indoor units
CNU
BL
Power source
(Single-phase)
220-240V~50Hz
TB1
220V~60Hz
RD
L
RD
Power source
F(3.15A)
WH
line
N
WH
F(3.15A)
Y/GN
Earth
Meaning of marks
Capacitor for FMI
CFI1
CNA~Z
Connector
Drain motor
DM
Fuse
F
Fan motor (with thermostat)
FMI1
FS
Float switch
Live Superlink terminal setting
JSL1
(for spare)
LED . 2
Indication lamp
(Green-Normal operation)
LED . 3
Indication lamp (Red-Inspection)
SM
Stepping motor
(for electronic expansion valve)
Indoor unit address : tens place
SW1
Indoor unit address : ones place
SW2
Outdoor unit address : tens place
SW3
Outdoor unit address : ones place
SW4
ThI-R1
ThI-R2
ThI-R3
t .
t .
t .
Control PCB
1
2
3
4
5
6
CNN
Y
3
1
CNW0
X6
X2
RD
X1
X3
1
3
5
7
9
C
UH
H
M
L
F(0.16A)
CNF3
WH
5
Y/GN
CNRI
M
WH
FM
1~
I
1
CFI1
Automatic adjustment/Fixed previous
SW5-1
version of Superlink protocol
SW5-2
Indoor unit address : hundreds place
Model capacity setting
SW6
Operation check, Drain motor
SW7-1
test run
TB1
Terminal block (Power source)
(□ mark)
Terminal block (Signal line) (□ mark)
TB2
Thc
Thermistor (Remote controller)
Thermistor (Return air)
ThI-A
Thermistor (Heat exchanger)
ThI-R1,2,3
Thermistor
TrI
X1~3,6
Relay for FM
Relay for DM
X4
mark
Closed-end connector
ThI-A
Tr
I
t .
220-240V
19V
24V
1
2
CNW1
CNW2
CNH
WH
BK
BK
LED • 2
SW1
SW2
SW5
X4
SW6
LED • 3
SW3
SW4
SW7
CNA
CNI
RD
CNR
1
3
BL
1
2
3
4
5
6
WH
M
SM
M
1~
FS
DM
Color marks
Mark
Color
BK
Black
BL
Blue
BR
Brown
GR
Gray
OR
Orange
RD
Red
WH
White
Y
Yellow
Y/GN
Yellow/Green
Notes
1.
indicates wiring on site.
2.Use twin core cord (0.75~1.25mm
outdoor unit, and signal line between indoor units.
3.Use twin core cord (0.3mm
controller in case that the total length is more than 100m.
4.Do not put signal line and remote controller line alongside power source line.
Option
+12
1
2
XR1
3
XR2
CNT
BL
4
XR3
JSL1
5
XR4
Superlink (spare)
6
XR5 (Remote operation input:
CNK2
volt-free contact)
BK
+12
1
2
XB1
CNT2
3
XB2
RD
CNB
CNK1
4
XB3
WH
WH
5
XB4
1
3
1
2
For Heat recovery
3-pipe systems
X
Y
A
B
TB2
X
X
Y
Y
Signal line (Shielded cord)
Remote
Signal line
controller
t .
between indoor units
Thc
2
) at signal line between indoor unit and
2
) at remote controller line. See spec sheet of remote
(Operation)
(Heating)
(Thermo ON)
(Inspection)
(20S)
(SVH)
(SVG)
(SVE)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents