Mitsubishi Heavy Industries FDC112KXEN6 Technical Manual page 236

Table of Contents

Advertisement

(iii) Installation of unit
1) Floor standing installation
a) Position of mounting bracket fixing bolts Drill holes by referring to figures below.
Hole for piping
& wiring on floor
b) The methed of drilling the wall is as follows.
all
Indoor
¯70~86 mm
c) Remove the front and side panels.
ase front panel
ase side panel
d) Level the unit using the level adjusting screw. Installation will be complrted after attaching side and front panel.
e) Exceute fixation following the directions described below.
● When fixed on the floor
hen fixed on the wall
4 places
Hole for piping &
wiring on wall
hen fixed on the floor
2 places
Outdoor
Sleeve
ase front panel
ase side panel
ase front panel
rame side panel
Tighten the bolt for floor
fixation using a flat washer
and double nut.
Mounting platc
(Accessories)
-
Bolt for wall mounting
Note (1) Be sure to use a bolt of the length for wall mouning.
Sealing plate
Side panel
● When fixed on the wall
232
-
30
all
all
Sleeve
Top panel
Frame
Tighten the bolt for wall
fixation using a flat washer
and double nut.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents