Step 6: Load The Ht Server Into The Rack - AMX MAX-HT04 Operation/Reference Manual

Max ht series digital media servers
Hide thumbs Also See for MAX-HT04:
Table of Contents

Advertisement

Step 6: Load the HT Server Into the Rack

Once the Rail Assemblies have been installed into the equipment rack cabinet, the server can be mounted
on the rails and slid into the rack (FIG. 49):
1. Slide the Rails (Intermediate Sections) out to their fully extended position.
2. Carefully align the Chassis Sections (mounted on the HT Server) with the extended Rails.
3. Slide the server onto the extended rails. Keep the server parallel to the floor when sliding the server
rails into the rails. Tilting the server up or down could result in damage to the Slide Rails.
4. Carefully slide the server into the rack until the Locking Release Tabs on the Chassis Sections (in
the equipment rack) engage the Intermediate Section Rails, securing the server in place.
Equipment Rack
FIG. 49
Sliding the server chassis into the rack
MAX HT Servers
Intermediate Section
(fully extended)
Chassis Section
Rack Mounting MAX Servers
CAUTION!
Refer to the Safety Instructions
on page one before installing
the server chassis into the
equipment rack