Rack Mounting MAX Servers

Step 5: Mount the Rail/Bracket Assemblies Into the Equipment Rack

Once the Extension Brackets (or End Brackets) and Adapter Bars have been attached to the Rail
Assemblies, the Rail/Bracket Assemblies are ready to be mounted into the equipment rack.
Install the Rack-Rail assemblies into the equipment rack, aligning the holes on the Adapter Bars to the
mounting rails in the rack as shown in FIG. 47:
Adapter Bar
FIG. 47
Align the holes on the Adapter Bar to the holes on the rails in the equipment rack
FIG. 48 shows the Adapter Bars properly mounted to the Rack-Rail assemblies and vertical mounting
rails in the equipment rack:
Front mounting rail on the
FIG. 48
Adapter Bars mounted to the equipment rack
46
Mounting Rail in equipment rack
Align the top hole on the Adapter Bar to the bottom hole
of the upper-adjacent RU in the equipment rack.
Align the center hole on the Adapter Bar to a center hole
in one of the RUs in the equipment rack.
Align the bottom hole on the Adapter Bar to the top hole
of the lower-adjacent RU in the equipment rack.
equipment rack
Rear mounting rail on the
equipment rack
MAX HT Servers