Maintenance; General; Maintenance Schedule; Maintenance Check List - Husqvarna PG 680 Operator's Manual

Hide thumbs Also See for PG 680:
Table of Contents

Advertisement

Available languages

Available languages

General

WARNING! The user must only carry out the maintenance and service work described in this
!
Operator's Manual. More extensive work must be carried out by an authorized service workshop.
The machine should be switched off with the power cable disconnected from the outlet.
Wear personal protective equipment. See instructions under the "Personal protective equipment"
heading.
The life span of the machine can be reduced and the risk of accidents can increase if machine
maintenance is not carried out correctly and if service and/or repairs are not carried out
professionally. If you need further information please contact your nearest service workshop.
Let your Husqvarna dealer regularly check the machine and make essential adjustments and repairs.

Maintenance schedule

Daily maintenance
Cleaning
External cleaning
Functional
General inspection
inspection
Grinding heads
Power button
Stop/run switch
Emergency stop
Protective cover
Service

Maintenance check list

External mechanical checks
Tilt the unit back. Check for and remove any Diamond tools
Check shroud for damages affecting the planetary rotation, satellite rotation, planetary seal efficiency
and extraction efficiency
Unplug the planetary drive to reduce operating noise. Run the discs through the range of speeds
listening for bearing noises caused by broken bearings
Unplug the small motor and run discs at low speed and check how discs are running.
Check the condition of belt and that the inside of the machine is clean
Check the headlocks and tighten if needed (3 per satellite)
Check movements of the satellites. If not running correctly, disassemble all heads.
Check the spring steel leaf and spring cushion carefully for wear
Check dust seals for wear
Unplug large motor and replace small motor. Run the planetary head through the range of speeds
and listen to operation.
Check condition of sprocket and chainring of the planetary drive gearbox. Replace if needed.
When planetary drive is removed, check for dust on the top surface. Check the condition of the
planetary head seal. Replace if needed.
24 – English

MAINTENANCE

Weekly maintenance
Planetary drive system
6 monthly
Internal components of
the machine
After 12-36 months
Grinding Heads Drive
System
Time required
(min)
2
5
5
5
10
5
15
10
5
5
5
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg 820

Table of Contents