Installation And Removal Of Power Supply Modules - ATTO Technology FibreBridge 7500 Installation And Operation Manual

16-gigabit fibre channel to 12-gigabit sas storage controller
Hide thumbs Also See for FibreBridge 7500:
Table of Contents

Advertisement

Installation and Removal of Power Supply
Modules
1
To remove a power supply module, first remove
the power cord.
2
Press the side latch inward and pull out on the
handle
Exhibit 2.0-4
6
ATTO Technology Inc. FibreBridge Installation and Operation Manual
3
To install a power module, insert module until
you hear the latch click.
Note
Handle and latch should be on top.
4
Install power cord.
CAUTION
CAUTION
Remove the power source before removing
the power supply module. Failure to do so
may cause injury or damage the unit.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fibrebridge 7500n

Table of Contents