Diamond DA 40 Flight Manual page 124

Table of Contents

Advertisement

Normal Operating
Procedures
5. Fuselage, Right Side:
a) Fuselage skin . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
b) Window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
c) Canopy, right side . . . . . . . . . . . . . . . . . . . . . visual inspection
%
d) Autopilot static source (if OÄM 40-267
%
installed) . . . . . . . . . . . . . . . . . . . . . . . . . . . . check for blockage
6. Right Wing:
a) Flap and linkage . . . . . . . . . . . . . . . . . . . . . . visual inspection
b) Flap hinges and safety pin . . . . . . . . . . . . . . . visual inspection
c) Aileron and linkage . . . . . . . . . . . . . . . . . . . . visual inspection
d) Aileron hinges and safety pin . . . . . . . . . . . . visual inspection
e) Foreign objects in aileron paddle . . . . . . . . . . visual inspection
f) Wing tip . . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
g) Position light, strobe light (ACL) . . . . . . . . . . visual inspection
h) Mooring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . check, clear
i) Entire wing surface . . . . . . . . . . . . . . . . . . . . visual inspection
j) 2 stall strips on wing . . . . . . . . . . . . . . . . . . . visual inspection
%
k) Tank air outlet in lower surface . . . . . . . . . . . visual inspection
l) Tank filler . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual check, fuel quantity
m) Openings on lower surface . . . . . . . . . . . . . . check for traces of fuel (if
n) Tank drain . . . . . . . . . . . . . . . . . . . . . . . . . . . drain off a small quantity,
o) Step . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
CONTINUED
Page 4A - 8
Rev. 8
01-Dec-2010
DA 40 AFM
must agree with indicator
tank is full, fuel may spill
over through the tank vent)
check for water and
sediment
Doc. # 6.01.01-E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents