Installers Information - Log Installation - Rinnai Royale FS35 ETR Operation & Installation Manual

Hide thumbs Also See for Royale FS35 ETR:
Table of Contents

Advertisement

INSTALLERS INFORMATION - LOG INSTALLATION

Issue 3
1. The log set is packed inside the heater and
the packaging must be removed prior to
installing the log set in its correct position
Open both side panels. (1 screw on lower
edge of each side panel).
Remove fastenings on both sides of the top
glass retainer.
Lift retainer away from heater.
Loosen screws on bottom glass retainer.
Carefully lift glass out of bottom channel.
Carefully remove log packaging.
The log is supplied in one piece with two holes underneath for location onto the pins inside the
heater.
2. Place the log set into the heater ensuring that the locating pins enter the two locating holes
on the bottom face of the logset.
3. Gently place loose ember bed material in front of the Front Log. Do not pour as dust
particles from the plastic bag as it may block the burner ports.
Level it with a pencil or screw driver and remove excess material. Note: The ember bed material must
be placed after the logs are fitted. If the logs are to be removed for any reason, the ember bed
material must be removed first and replaced after the logs are refitted. Any material that prevents the
logs sitting flat on the burner top can upset the burning pattern and performance of the heater.
4. Replace glass and top glass retainer, tighten bottom glass retainer screws.
Note: Fit glass so that the join/gap in the glass seal is at the bottom.
Take care not to damage seals.
Reinstall side panels.
Note: When first lighting the heater, the logs need to be burnt in, which may take approximately 2
hours. The flame colour may change after the initial burning in period.
Royale - Freestanding
- 17 -
Issue 3 - ©Rinnai

Advertisement

Table of Contents
loading

Table of Contents