Installation Procedures; B) Venting; C) Electrical; Step 4 - Assembling - Zip 203362 Clage- Hydroboil Installation And Operating Instructions Manual

Table of Contents

Advertisement

Aprox weight when filled
3.0 Litre models 12.5 kg
5.0 Litre models 16.5 kg
7.5 Litre models 20.5 kg
250mm
45 mm
Concealed
Inlet
Vent line
Special Note
Ensure the silicon outlet tube is
correctly positioned within the outlet
nozzle. Failure to do this may cause
internal flooding.
Inlet water
temperature
15°C
3.0 Litre models
16 min
5.0 Litre models
16 min
7.5 Litre models
23 min
Page 6 of 16

Installation Procedures

For concealed plumbing connections, connect the cold water pipe through the
rear of the chassis using a 15 mm or half-inch capillary elbow.
Cold water pipes must be flushed before connection to the inlet. Any clogging
due to sediment or fines will adversely affect the operation of the heater.
The heater must be installed with an isolating valve which allows it to be isolated
from the mains supply for servicing.
Water pressure requirements:
Minimum - 0.7 bar, maximum - 7 bar.
Warning: If pressure is likely to exceed 7 bar, a pressure limiting valve must be
Wring
installed in the cold water supply line. Clage-Zip recommends a valve rated at
3.5 bar for this application.

b) Venting

A vent at the base of the heater must be plumbed to a safe visible location as,
Concealed
under certain conditions, it may discharge cold or boiling water and/or steam.
Vent
For exposed vent plumbing, connect vent outlet from the base of heater to a
15 mm or half inch OD pipe which has a continuous fall, is no more than 3
metres long, has no more than 3 right angle bends, and discharges to a waste
water drain.
For concealed vent plumbing, direct the vent outlet from the heater rear, using
a visible tundish. (see diag at left)

c) Electrical

For concealed electrical connection, connect a power cable through the rear
access opening of the heater to the terminal block within the heater as shown.
For exposed electrical connection, connect the flex and plug (fitted to the
heater) to a standard power outlet on the wall within 1500 mm of the heater
that will adequately cater for the units power needs.
Visible Tundish
Do not turn the power ON until the heater is filled to the tap level, with water.
Step 4 – Assembling
Place the heater case back on to the heater and secure the top 2 case screws.
Secure two bottom case screws.
Step 5 – Commissioning
Check previous steps. Turn water supply ON. Water is now flowing into heater,
check connections for leaks. Wait approximately 5 minutes and check outlet
tap for water. This is achieved by pressing the tap paddle.
Power is only to be turned on when water is available from this outlet.
Turn power ON. After a short period, boiling water will be available and will be
maintained close to boiling point thereafter. Initial heating periods are shown in
the table on the left.
10°C
17 min
17 min
24 min
Clage-Zip Hydroboil Electronic - Installation & Operating Instructions - 87490 - June 2009
(continued)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents