Installer—READ THIS FIRST
1. YOU NEED TO KNOW FROM THE
HOMEOWNER what accessories (surround,
screen, fan/blower, etc.) will be installed with
this fi replace;
2. Unpack the appliance.
3. Check that you have everything.
4. Clean cavity, chimney, ash dump, and clean-out.
5. Install venting pipes.
6. Attach conversion plate to existing fi replace.
7. Install electrical wiring for fan if used.
8. Place appliance on hearth in front of fi replace
opening.
9. Install and test fan if used.
10. Put batteries in remote control handset and battery
box. Connect battery box.
11. Connect and test gas supply.
12. Fit appliance into cavity.
13. Remove window.
A few points must be considered before inserting the
785IL into an existing fi replace cavity. Generally, no
modifi cations are allowed to the existing fi replace that
will compromise the integrity of the existing fi replace.
Components that are bolted or screwed on such as
dampers or baffl es may be removed to accommodate
the installation of the 785IL engine. Cutting away
any sheet metal parts of the existing fi replace
to accommodate the installation of the 785IL is
prohibited. Check with local authorities if in doubt.
Clean Fireplace and Chimney
Have the chimney swept and the fi replace cavity
including ash dumps and clean-outs cleaned before
installing the 785IL heater and vent liners. Any creosote
or soot residue remaining in the fi replace cavity
chimney or clean-out may cause odors or stains once
the 785IL insert is installed. Consult with chimney
sweep for information on how best to clean.

Installation Planning

Existing Fireplace Preparation

14. Install ceramic panels and logs.
15. Refi t window.
16. Set-up remote control.
17. Verify operation and adjust aeration settings.
18. Install the remote control handset wall holder.
19. Instruct the homeowner on the operation and
maintenance of the fi replace.
20. Install the trim and screen if required.
Tools and supplies required
• Packing knife
• Screwdriver set
• Pliers
• Adjustable Wrench
• Sealant
• Dish soap/water solution
• Gloves
• Eye Protection
• Electric outlet if installing a fan
Existing Dampers
Factory-built, zero-clearance fi replaces will require the
damper to be removed in order to install the vent liners.
These dampers are usually bolted into place. Dampers
in masonry fi replaces must be fi xed open and may
remain in place.
Ash Retaining Curbs
Some fi replaces (particularly factory-built) have a
raised curb at the front edge to retain ashes. Check the
dimensions carefully to ensure the 785IL engine will fi t
behind any raised curb (some curbs may be removed
separately from the refractory base).
INSTALLATION
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Legend g4 785ilp

Table of Contents