INSTALLATION
8. Place the right-hand cross log locating its notch on the key on the top of the rear log as indicated.
Rest the front end of the log centered on top of the center base log.
1. To refi t the window, place it in its bottom railing and
push its top against the fi rebox.
2. While you hold it, pull the side levers back into the
window brackets on each side.
3. Pull out the top of the window and release it to
ensure the springs return it.
4. Apply light hand pressure against the window frame
sides to bed-in the window seal.
Window frame
Bottom railing
20
Ceramic Logs Installation
Ensure the logs do not
cover the burner holes
indicated here
Window Refi tting