Installing the cover (rack)

Note:
The illustrations in this document might differ slightly from your hardware.
Flange
To install the server top cover:
1. Align the top cover with the top of the server, about 25mm (1inch) from the front
of the server; the flanges on the left and right sides of the cover should be on the
outside of the server chassis.
2. Hold the cover against the server and slide the cover toward the front of the
server until the cover clicks into place.