Foot Switch Adjustment; Boom Synchronizing Procedure - JLG 600A Service And Maintenance Manual

Table of Contents

Advertisement

4.10 FOOT SWITCH ADJUSTMENT

Adjust so that functions will operate when pedal is at cen-
ter of travel. If switch operates within last 1/4 in. (6.35 mm)
of travel, top or bottom, it should be adjusted.

4.11 BOOM SYNCHRONIZING PROCEDURE

NOTE: If the Lower Boom assembly does not fully lower:
1. Remove all personnel from the platform.
3121201
NOTE: If any rotator bolts are replaced, all bolts
A,B,D
C,D
A
Torque to 50 ft.lbs. (68 Nm)
B
Loctite #242
C
Torque to 480 ft. lbs. (650 Nm)
D
Check torque every 150 hours of operation
E
Torque to 85 ft. lbs. (115 Nm)
Figure 4-23. Platform Support Torque Values
– JLG Lift –
SECTION 4 - BOOM & PLATFORM
2. Pull the red knob located under the manual descent
control valve.
3. From Ground Control, activate the lift control switch,
raise Lower Boom 6 feet (1.83m).
4. After raising Lower Boom, release the red knob.
5. Activate Lower Boom Down, fully lower boom.
6. Repeat step 1 thru 5 if necessary.
on the rotator should be retorqued.
E
4-33

Advertisement

Table of Contents
loading

This manual is also suitable for:

600aj

Table of Contents