Limit Switches And Cam Valve Adjustment - JLG 600A Service And Maintenance Manual

Table of Contents

Advertisement

3. Align bottom tubes with attach holes in rotator sup-
port. Using a soft head mallet, install rotator support
pin #5 into articulating jib boom and secure with
mounting hardware.
4. Align articulating jib boom with attach hole in articu-
lating jib boom pivot weldment. Using a soft head
mallet, install rotator support pin #4 into articulating
jib boom and secure with mounting hardware.
5. Align bottom tubes with attach holes in articulating
jib boom pivot weldment. Using a soft head mallet,
install rotator support pin #3 into articulating jib
boom pivot weldment and secure with mounting
hardware.
6. Align articulating jib boom pivot weldment with
attach holes in fly boom assembly. Using a soft head
mallet, install pivot pin #2 into fly boom assembly
and secure with mounting hardware.
7. Align the slave leveling cylinder with attach holes in
articulating jib boom pivot weldment. Using a soft
head mallet, install slave leveling cylinder pin #1
into articulating jib boom pivot weldment and secure
with mounting hardware.
4.6 LIMIT SWITCHES AND CAM VALVE
ADJUSTMENT
Adjust switches and cam valve as shown in Figure 4-9.,
Boom Limit Switch Adjustments.
3121201
SECTION 4 - BOOM & PLATFORM
– JLG Lift –
4-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

600aj

Table of Contents