Operating Guidelines; Initial Procedures - aoyue Int2930 Instruction Manual

Table of Contents

Advertisement

OPERATING GUIDELINES

6. To save the settings, repeatedly press the SET button until the
display shows the word "SAVE". Press the decrease button to save
and exit from the system configuration mode.
7. The two quick jump settings has now been configured and can be
accessed by simultaneously pressing the "INCREASE" and "SET" but-
ton for the first Quick jump level. And simultaneously pressing the
"DECREASE" and "SET" button will access the second quick jump
level.
Quick Jump #1
b350 (default)
Increase + Set
E. SLEEP FUNCTION
The Soldering Iron is equipped with a vibration sensor. When the
soldering iron has been left unmoved the system would begin the count
down of the sleep timer. The suffix will change to a small letter "d" to
indicate that the system is preparing to enter sleep mode. The display
will show four dashes "- - - - " to indicate the system has entered sleep
mode. To wake the system, simply lift up the soldering iron or push
any control buttons.
Sleep timer is configurable via the following method:
1. With the unit turned On, press and hold the SET button.
2. Wait for the display to change to "A###", then repeatedly press the
"SET" button until a number with prefix "t" or "t000" is displayed.
This denotes that we are now configuring the sleep timer setting.
10
10
10
10
Quick Jump #2
C430 (default)
Set + Decrease
OPERATING GUIDELINES
REMINDERS:
1. Make sure the equipment is placed on a flat stable surface and
all the heat-generating components placed on their respective
holders or stands.
2. Ensure all function switches are in the OFF position.
3. Ensure all terminal connections are properly secured.
Please refer to the CONTROL PANEL GUIDE page
IMPORTANT:
for buttons and display panel directory.
A. INITIAL PROCEDURES
1. Insert the power cord into the receptacle at the back of the station.
2. Plug the power cord into a grounded wall socket. The station is
protected against electrostatic discharge and must be grounded for
full efficiency.
3. Be sure the power switch is OFF before connecting or disconnecting
the soldering iron cord. Failure to do so may result in damage to
the circuit board.
4. Follow instructions on soldering iron stand assembly guide.
5. Attach the soldering iron to the 7-pin output at the bottom right
area of the station.
6. Place soldering iron to the soldering iron stand as shown .
7. Dampen the sponge with water and squeeze excess water before
using. The tips maybe damaged when used with dry sponge.
8. The unit is now ready for use.
7 7 7 7

Advertisement

Table of Contents
loading

Table of Contents