End-Of-Season Shutdown; Checking The Internal Components - RED LOGIKA 25-35 Installation Manual

Table of Contents

Advertisement

11 - MAINTENANCE AND CLEANING
ATTENTION:
The frequency with which the smoke exhaust system must be cleaned depends on the use of the boiler and the type
of installation.
We recommend relying on an authorized service centre for end-of-season cleaning and maintenance, they will carry
out all of the previously mentioned work and make a general check of the stove's components.

END-OF-SEASON SHUTDOWN

At the end of season, before shutting down the boiler, we recommend completely removing pellets from the tank with the use of a
vacuum cleaner with an extension.
Upon re-start, when pressing the main switch (located on the back of the boiler) does not make the control panel display light up, it could
mean that the service fuse needs replacing.
On the rear of the boiler there is a fuse holding compartment which is located underneath the supply socket. Use a screwdriver to open the
fuse-holder compartment and if necessary replace them (6.3A delayed)

CHECKING THE INTERNAL COMPONENTS

ATTENTION!
The internal electromechanical components must only be checked by qualified personnel whose technical expertise
includes combustion and electricity.
It is advisable to carry out this annual periodic maintenance (with a programmed assistance contract) which involves a visual inspection
and checking the working order of the internal components.
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents