Tower-To-Rack Conversion Option - HP ProLiant ML370 G5 User Manual

Hp proliant ml370 generation 5 server user guide
Hide thumbs Also See for ProLiant ML370 G5:
Table of Contents

Advertisement

Do one of the following:
2.
Open or remove the tower bezel, as needed
Extend the server from the rack (on page 22).
Remove the access panel (on page 25).
3.
Remove an expansion slot cover
4.
Install the parallel and serial connector bracket and close the slot release lever.
5.
Connect the parallel and serial cables to the parallel and serial connectors on the system board.
6.
Install the access panel.
7.
Do one of the following:
8.
Close or install the tower bezel, as needed.
Slide the server back into the rack.
Power up the server (on page 20).
9.
Enable the feature under the System Options menu in RBSU. For more information on RBSU, refer to
10.
the HP ROM-Based Setup Utility User Guide on the Documentation CD or the HP website
(http://www.hp.com/servers/smartstart).

Tower-to-rack conversion option

The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a
rack model server and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
Rack rails
Cable management arm
Server rails
Rack bezel
Front video connector cable
In addition to the items supplied in the conversion kit, you will also need a Torx T-15 screwdriver (clipped
to the rear panel of the server).
To convert a tower server to a rack server:
("Open or remove the tower
("Removing the expansion slot
bezel" on page 21).
cover" on page 60).
Hardware options installation 64

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents