c. Fit the protection bushing (A in
Figure 3-6 Fitting in the protection bushing
d. Insert the PDU connection side of the power cords through the top opening of
Figure 3-7 Inserting power cords
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
80
the rack.
A in
Figure 3-7
represents the power cord for single-phase power feed.
B in
Figure 3-7
represents the power cord for three-phase power feed.
Figure
3-6) in the top opening of the rack.
A
A
B