Items Requiring Confirmation Before Installation - Fujitsu M10 Installation Manual

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Figure 2-2     Rack configuration (for the PCI expansion unit)
2.2
Items Requiring Confirmation before
Installation
This section describes the items that you need to confirm before installing the SPARC
M10 system. Before starting installation work, confirm that the requirements in
Table 2-1
Table 2-1     List of items requiring confirmation before installation
Check item
System
configuration
Training
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
have been met.
- Has the system configuration been determined?
- Has the required rack space been confirmed?
- Has the number of racks been decided?
- Have the system administrator and operators attended the
required training courses?
Chapter 2 Planning and Preparing for System Installation
Check
column
21

Advertisement

Table of Contents
loading

Table of Contents