Fujitsu M10 Installation Manual page 276

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Figure 9-3     Protection bracket
6.
Set the ID of the target SPARC M10-4S.
For details, see
7.
Connect the additional crossbar cables.
For a cable routing diagram of connections and a cable list, see
Cable Connection Information on Building Block
For details on the connections in direct connections between chassis, see
Connecting Cables (for Direct Connections between
Remarks - For connections through crossbar boxes, the additional crossbar cables are
secured to the expansion rack. When packed, the cables are tied to a rack column with their
connectors wrapped in a bag. Remove the cable connectors from the rack column and
unpack them. For details, see
8.
Connect the additional XSCF BB control cables.
For a cable routing diagram of connections and a cable list, see
Cable Connection Information on Building Block
For details on the connections in direct connections between chassis, see
Connecting Cables (for Direct Connections between
9.
If the installation expands the 1BB configuration to up to the 4BB configuration
with direct connections between chassis, connect the XSCF DUAL control
cable.
For details, see
10. Connect LAN cables to the target SPARC M10-4S.
For details, see
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
262
"4.1 Setting the ID (BB-ID) Identifying a
"Figure
4-13."
"4.2 Connecting Cables (for Direct Connections between
"5.2 Connecting Cables to the SPARC M10-4/SPARC
A
Chassis."
"Appendix B
Configurations."
Chassis)."
"Appendix B
Configurations."
Chassis)."
Chassis)."
M10-4S."
"4.2
"4.2

Advertisement

Table of Contents
loading

Table of Contents