d. Secure all the power cords to the column, with the supplied binding bands (A
Figure 3-13     Securing power cords
A
Remarks -
for three-phase power feed.
4.
Attach the side plate that was removed in step 2.
Attach the plate by reversing the removal procedure of step 2. Move the rack as
appropriate into position for attaching the side plate.
5.
Move the rack to the installation location.
3.3.2

Securing the rack

When installing the rack, always adjust the leveling feet as follows, regardless of
whether the rack will be anchored to the building floor. Keep the rack level with the
leveling feet. Make sure that the casters are approximately 2 mm (0.1 in.) above the
floor surface. The casters must not support the weight of the rack.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
86
in
Figure
3-13).
When securing them, allow an extra length of about 30 cm (12 in.) in each
power cord.
Figure 3-13
shows single-phase power feed. The required lengths are the same as