Fujitsu M10 Installation Manual page 286

Hide thumbs Also See for M10:
Table of Contents

Advertisement

For the initialization of the chassis of the master XSCF, perform that work at the
end.
Execute the restoredefaults -c factory command to return to the factory defaults,
including the CPU Activation key information. Perform this work with a serial
connection to the master XSCF.
For XCP 2041 or later, execute the restoredefaults -c factory -r activation command.
The key must be reinstalled at initial setup of the XSCF after installation.
1.
Log in to the master XSCF.
2.
Execute the showhardconf command, and confirm the chassis serial number
of the system board (PSB) targeted for release.
For details, see
Note - If the serial number of the chassis of the master XSCF is not being used as the system
serial number, execute the switchscf command to switch the master XSCF.
3.
Execute the poweroff command to stop all the physical partitions.
XSCF>   poweroff -y  -a
PPAR-IDs   to   power   off:00,01,02   03
Continue?   [y|n]:y
00:Powering   off
01:Powering   off
02:Powering   off
03:Powering   off
4.
Execute the deleteboard command from the master XSCF to release a system
board (PSB) from the physical partition configuration.
The following example releases system boards 00-0, 01-0, 02-0, and 03-0 from the
physical partition.
XSCF>   deleteboard -c unassign 00-0 01-0 02-0 03-0
PSB#00-0   will   be   unassigned   from   PPAR   immediately.   Continue?[y|n]   : y
PSB#01-0   will   be   unassigned   from   PPAR   immediately.   Continue?[y|n]   : y
PSB#02-0   will   be   unassigned   from   PPAR   immediately.   Continue?[y|n]   : y
PSB#03-0   will   be   unassigned   from   PPAR   immediately.   Continue?[y|n]   : y
5.
Execute the showresult command, and confirm the end status of the
previously executed deleteboard command.
In the following example, 0 is returned as the end status, so the execution of the
deleteboard command has completed correctly.
XSCF>   showresult
0
6.
Execute the showboards command to check the system board (PSB) status.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
272
"A.2.1 Checking the component
 
status."

Advertisement

Table of Contents
loading

Table of Contents