Fujitsu M10 Installation Manual page 86

Hide thumbs Also See for M10:
Table of Contents

Advertisement

unit through a crossbar box. Dedicated power distribution units (PDUs) for
supplying power, crossbar boxes, crossbar cables, and XSCF cables are mounted as
standard in the expansion rack.
The expansion racks are expansion rack 1 and expansion rack 2. Expansion rack 1 is
used for configurations up to the 8BB configuration. Expansion rack 2 is used for the
9BB to 16BB configurations.
Table
Table 3-7     Reference: List of accessories for expansion rack 1
Number
in figure
1 to 3
4
5
6
7
8
9
10
11
12
*1 Eight cables are supplied for the single-phase power supply, and six cables for the three-phase power supply.
Table 3-8     Reference: List of accessories for expansion rack 2
Number
in figure
1 to 3
4
5
6
7
8
9
10
11
12
13
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
72
3-7,
Table
3-8, and
Table 3-9
Name
PDU power cord (for connecting PDU and
customer facilities)
Binding band
Hook-and-loop fastener strip
Cage nut attachment tool
Key (for both front and rear doors)
Cable holder (F)
Cable holder (R)
M5 flat-head screw (for attaching cable holder)
M5 core spring nut (for attaching cable holder)
Protection bushing (for top cover opening)
Name
PDU power cord (for connecting PDU and
customer facilities)
Binding band
Hook-and-loop fastener strip
Cage nut attachment tool
Key (for both front and rear doors)
Cable holder (F)
Cable holder (R)
M5 flat-head screw (for attaching cable holder)
M5 core spring nut (for attaching cable holder)
Protection bushing (for top cover opening)
Crossbar unit
below list the components of the expansion racks.
Quantity
8 or 6
8
1 set
1
2
10
2
12
12
3
Quantity
8 or 6
8
1 set
1
2
10
2
12
12
3
2
Remarks
(*1)
Remarks
(*1)
(*2)

Advertisement

Table of Contents
loading

Table of Contents