Fujitsu M10 Installation Manual page 122

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Note - After removing its screw, hold the rail level with both hands. If the rail tilts, it may
stretch.
Figure 3-43     Attaching the rail: Locations of protrusions
Mounting
area (4U)
Figure 3-44     Attaching the rail: Fixing location of the screw
2U bottom
7.
Attach the cable support fixing brackets to the rear supporting columns of the
rack.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
108
2U top
1U top
1U bottom
FRONT
FRONT
FRONT
FRONT
Mounting
area (4U)
REAR
REAR

Advertisement

Table of Contents
loading

Table of Contents