breaker of the BB#1.", appears during command execution.
For the mounting procedure, see
M10-4S in a
rack."
Remarks - When installing the M10-4S in an existing expansion rack, you need to remove the
protection bracket and blank panel of the mounting space (A in
are cases where no protection bracket is attached, depending on the installation. The blank
panel is secured with two M6 screws. The protection bracket is secured with four M6 screws.
Figure 9-1     Protection bracket
c. Set the ID of the target SPARC M10-4S.
For details, see
d. Connect the additional crossbar cables.
For a cable routing diagram of connections and a cable list, see
Cable Connection Information on Building Block
For details on the connections in direct connections between chassis, see
Connecting Cables (for Direct Connections between
e. Connect the additional XSCF BB control cables.
For a cable routing diagram of connections and a cable list, see
Cable Connection Information on Building Block
For details on the connections in direct connections between chassis, see
Connecting Cables (for Direct Connections between
f. The installation expands the 1BB configuration to the multiple BB
configuration. So, connect the XSCF DUAL control cable.
"3.4.2 Mounting the SPARC M10-4/SPARC
"4.1 Setting the ID (BB-ID) Identifying a
Chapter 9 Installing a System with a Building Block Configuration
Figure
9-1). Note that there
A
Chassis."
"Appendix B
Configurations."
Chassis)."
"Appendix B
Configurations."
Chassis)."
"4.2
"4.2
243