Suzuki DF 40 Service Manual page 305

Four stroke
Hide thumbs Also See for DF 40:
Table of Contents

Advertisement

PERFORMANCE TEST
I CAUTION
I
Each test mllst
be performed
within 3 - S seconds to
avoid coil damage from overheating.
A
WARNING
When performing the following test, be sure to con-
nect the battery and the starting motor with a lead wire
of the same size as original equipment used there.
PULL-INIHOLD-IN TEST
Connect battery to magnetic switch as shown in figure .
• Check that plunger and pinion (over-running clutch) move out-
ward.
If plunger and pinion don't move, replace magnetic switch.
NOTE:
Before testing, disconnect brush lead from terminal "M" .
• While connected as above with plunger out, disconnect nega-
tiVe
lead from terminal "M".
Check that plunger and pinion remain out.
it plunger and pinion return inward, replace magnetic switch.
PI UNGER AND PINION RETURN TEST
Disconnect negative lead from switch/motor body.
Check that plunger and pinion return inward.
If plunger and pinion don't return inward, replace magnetic
switch.
DF40/S0 "KS" (,OS) MODEL
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df 50

Table of Contents