Toshiba RAV-SM563UT-E Service Manual/Integration page 186

Air-conditioner split type
Hide thumbs Also See for RAV-SM563UT-E:
Table of Contents

Advertisement

4. Cord heater installation work procedure
No.
Photo / Explanatory diagram
Remove each cabinet, inverter assembly, motor base assembly, and partition board assembly.
1
* Do not damage the electric parts such as cables, connectors, etc. while this work.
1-1
1-2
Side cabinet (L)
Inverter assembly
1-3
1-4
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
Upper cabinet
Valve cover
Water-proof
cover
Wiring cover
Front cabinet
Side cabinet (R)
– 186 –
www.heronhill.co.uk
Procedure
Remove the upper cabinet and the valve cover.
Related parts / Screws list
Part name
Screw type
Upper cabinet
Ø4 × 8
Valve cover
Ø4 × 1
Remove the front cabinet, the wiring cover and the
water-proof cover.
Related parts / Screws list
Part name
Screw type
Front cabinet
Ø4 × 8
Wiring cover
Ø4 × 8
Remove the side cabinet (R/L) and the inverter
assembly.
Related parts / Screws list
Part name
Screw type
Side cabinet (R)
Ø4 × 8
Side cabinet (L)
Ø4 × 8
Inverter assembly
Ø4 × 8
Remove the inverter assembly.
No.
Part name
1
TE sensor
2
TD sensor
3
TO sensor
4
TS sensor
5
4-way valve coil
6
PMV coil
7
Fan motor
(Intermediate
8
Compressor lead
Reactor
(Intermediate
9
(2 pieces.)
Fax: 01823 665807
Used screw
Quantity
5
1
Used screw
Quantity
7
2
Used screw
Quantity
7
3
1
Connector
Connector
No.
color
CN600
White
CN601
White
CN602
White
CN603
White
CN701
Yellow
CN700
White
CN300
White
White
connector)
White
connector)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents