Toshiba RAV-SM563UT-E Service Manual/Integration page 158

Air-conditioner split type
Hide thumbs Also See for RAV-SM563UT-E:
Table of Contents

Advertisement

No.
Part name
11
Reactor
1) Perform works of items
NOTE)
The same two reactors are installed to this
outdoor unit though each installation place
is different.
One is attached to a partition board, and the
other is attached to an electric parts box.
2) Remove the connector of the reactor lead
3) Remove fixing screws of the reactor.
The temperature of the reactor becomes
high during operation of the outdoor unit.
Using a cord holder, fix various sensor lead
wires or fan motor lead wires in the sur-
roundings of the reactor to be fixed to the
electric parts box as shown below so that
they do not come to contact with the reac-
tor.
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
Procedure

wire connected to the inverter assembly.
<Cautions for assembling>
Cord holder
Fan motor lead wire
Various sensor
Reactor
lead wires
– 158 –
www.heronhill.co.uk
to
.
Partition board
Electric parts box
Remarks
Reactor
Reactor
Fax: 01823 665807

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents