Toshiba RAV-SM563UT-E Service Manual/Integration page 184

Air-conditioner split type
Hide thumbs Also See for RAV-SM563UT-E:
Table of Contents

Advertisement

No.
Part name
Q'ty
13
Power cord
1
14
Thermostat
1
fixing plate
15
PVC tube
1
16
Shield tube
1
17
Bundling tie
1
NOTE: The parts on the above table are recommended parts.
2. Required tools for installation work
No.
Part name
1
Plus screwdriver
2
Wrench
3
Motor drill
4
Faston crimping tool
5
Close-end connector
crimping tool
6
Cutting plier
7
Stripper
8
Cutter knife
9
Insulation tape
10
Metal-cutting shears
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
Specifications/Vendor
2-cores x 0.75mm² or more, H05RN-F
Material: SGCC-Z08, Board thickness: 0.8t
Inside diameter Ø8 x outside diameter Ø11 x 70 mm
Inside diameter Ø18 x outside diameter Ø26 x 70 mm
Material: Polyethylene foam
Bundling tie for securing the wires
Material: 6/6 nylon
Specifications
It is used for disassembling and assembling of each cabinet.
It is used for disassembling and assembling of compressor fixing nuts.
Drill diameter:
It is used to make the additional holes on the base or the side
Ø3.2 and Ø5.0
cabinet (R).
Fixing jig for #250
It is used to process the side cabinet (L).
– 184 –
www.heronhill.co.uk
Remarks
Procured locally
Procured locally
(Drawing attached)
Procured locally
Procured locally
Procured locally
Usage
Fax: 01823 665807

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents