U/D PCB unit
・Assemble the U/D PCB unit (#B16620) in the body.
① The shutter must be in state of charging (being about to be released).
(Check this by the shutter curtain.)
② The charging SW must be at the initial position.
(All the brushes are on the gold pattern.)
③ The mirror charge lever and shutter charge lever must be at the initial position.
① In state of charging
OK
NG
・Tighten three screws (#1573) in order.
・Tighten the screw (#1572).
#1572
② Charge SW:
Initial position
④
- A5 ・
③ Charge lever(Mirror):
No gap
②
#B16620
①
③
-
INC
VBA13001-R.3677.A
③ Charge lever(shettur):
Initial position
#1573×3