Average Task Duration - Fujitsu Server PRIMERGY TX1330 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for Server PRIMERGY TX1330 M1:
Table of Contents

Advertisement

– Front panel module
– Management and diagnostics modules
– System board
– Standard power supply unit
– Trusted Platform Module (TPM)
– USB Flash Module (UFM)
2.2

Average task duration

Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to the following table for an overview of steps taken into account for
calculating the average task duration:
Step
Server shutdown
Rack removal,
disassembly
Transport
Maintenance
procedures
Transport
Table 1: Calculation of the average task duration
TX1330 M1
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on
page
Making the server available, removing the
yes
server from the rack (if applicable)
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks
Returning the server to its installation site
no
(where required) depends on local
customer conditions.
Upgrade and Maintenance Manual
69".
Before you start
25

Advertisement

Table of Contents
loading

Table of Contents