Active Convection Blower Replacement - Heat & Glo RED60 Installation Manual

Installation and appliance setup
Hide thumbs Also See for RED60:
Table of Contents

Advertisement

D. Active Convection Blower Replacement
WARNING! Risk of Shock! Label all wires prior to dis-
connection when servicing controls. Wiring errors can
cause improper and dangerous operation. Verify proper
operation after servicing.
WARNING! Risk of Shock! Replace damaged wire with
type 105° C rated wire. Wire must have high temperature
insulation.
1. Remove any interior enhancement kit(s), such as glass
rock media, granite or porcelain, that have been already
installed in the appliance.
2. Remove pilot shield as shown in Figure 8.8.
Figure 8.8 Removing Pilot Shield
3. Remove screws from base pan and lift base pan up
and out of appliance. Set aside. See Figure 8.9 and
Figure 8.10.
Figure 8.9 Removing Screws from Base Pan
Figure 8.10 Lifting Base Pan Up and Out.
56
Heat & Glo • RED60 Installation Manual • 2159-980 Rev. D • 11/13
4. Remove screws from each end of burner assembly.
Pull burner out of appliance. Set aside.
Figure 8.11 Side Burner Screw
5. Remove left or right side glass pane frame, depending
on placement of blower, from bottom of fi rebox. Remove
glass pane and gaskets. Gaskets may have become
fragile from heat exposure. Handle with care. At this
point, blower and other components located under the
fi rebox are accessible.
Figure 8.12 Glass Pane Frame
Figure 8.13 Removing Glass Pane Frame
6. Remove four screws from valve and component tray
that is attached to the very bottom of the fi replace.
This entire tray can be slid to the side to provide easier
access to the blower. Removing these screws will
require a longer bit shaft in a cordless drill to reach
down through the fi rebox opening. See Figure 8.14.
SIDE BURNER SCREW

Advertisement

Table of Contents
loading

Table of Contents