Heat & Glo RED60 Installation Manual page 31

Installation and appliance setup
Hide thumbs Also See for RED60:
Table of Contents

Advertisement

Note: The PVK-80 Power Vent includes a 6 1/2 foot 5-wire
assembly wired into the vent cap blower motor. If this wire
assembly will not reach the fi replace, the wires may need
to be spliced to additional wire lengths in a junction box in-
stalled inside the building. Follow applicable electric codes.
The RED60 appliance comes wired for use with either a
PVI-DVP power vent or a PVK-80. If opting to use a PVK-
80 power vent, these instructions must be followed carefully
to ensure the proper function of the appliance.
1. Refer to RED60-PVK-80 wiring diagram. See Figure
4.39.
2. Remove module heat shield cover plate.
3. Plug the male connectors from wire harness in ACC box
onto the red and brown wires on the IPI wire harness.
Route the remainder of the harness to where the PVK-
80 wiring will enter the appliance.
4. Plug white connector on other harness in ACC box
into the AUX2 port of the AUX300 module. Route the
remainder of harness to where the PVK-80 wiring will
enter the appliance.
5. If required, bore an additional 7/8 inch diameter hole
in the side of the fi replace outer wrap near where the
wire hole already exists. Use a strain relief connector
to secure wires whenever wires pass through a steel
panel. See Figure 4.37.
6. Remove and discard wires currently attached to terminal
block included with the PVK-80. They are not needed.
7. Place the PVK-80 terminal block assembly in the cavity
under the fi replace behind the blower using provided
velcro pads. See Figure 4.37. Connect the black,
white, and green wires from the power vent assembly
to the terminal block according to the wiring diagram.
See Figure 4.38 and Figure 4.39. Attach 1/4 inch male
wiring connectors to red and brown wires from PVK-80
Power Vent.
WIRES TO AUX300
TERMINAL BLOCK
Figure 4.38
WIRES FROM POWER VENT
Heat & Glo • RED60 Installation Manual • 2159-980 Rev. D • 11/13
8. Plug brown and red wire ends of harness routed in
Step 3 onto the brown and red wires from the PVK-80
wiring harness.
9. Connect ends of harness routed in Step 4 to the terminal
block, connecting like colors to one another: green to
green, white to white, black to black.
10. Replace module heat shield cover plate removed in
Step 2.
11. Use a cable tie to connect the wires together so that
no wire is in contact with the top of the cavity under the
fi replace.
12. Reconnect electrical power supply to the junction box.
INSTALLATION INSPECTION
1. Follow safety inspection procedures recommended by
national, provincial, and/or local codes.
2. Be certain all electrical connections are properly made
and secure.
3. Visually inspect the vent system and determine that
there is no fl ue gas spillage, blockage or restriction,
leakage, corrosion or other unsafe defi ciencies.
4. Place the fi replace in operation and determine that the
burner and power vent are operating properly. The
main burner should show no signs of fl oating, lifting, or
fl ashbacks.
WARNING! If any unsafe condition is determined when
inspecting the installation and operation of the fi replace
and Power Vent, the equipment should be shut off. Cor-
rections MUST be made before the equipment is put into
continuous operation.
SETTING THE EXHAUST CONTROL
The PVK-80 has an exhaust control lever which must be
set and secured during the Installation Inspection. The
lever is located behind the electrical cable connector of
the cap housing and is factory set in the closed position.
See Figure 4.40.
The exhaust control lever must remain in the closed po-
sition for optimum appliance performance. Secure the
exhaust control lever to the power vent housing with the
sheet metal screw. Do not change this setting.
WARNING! Risk of Overheating! DO NOT change ex-
haust control lever setting! Glass failure will occur.
31

Advertisement

Table of Contents
loading

Table of Contents